3.6 MW power project, Bombaina I & II location, N. Ilias


Land leveling, 3.6 MW power project, Bombaina I & II site, Ilia Prefecture


Power projects of 1 MW, Prefecture of Athens & Prefecture of Magnesia


Power projects of 1 MW, Prefecture of Athens & Prefecture of Magnesia


Power projects of 500 KW, N. Magnesia


100 KW power project, N. Ilias


ILIA 2MW


1500kW MESOLOGGI

15.100kW ILIA

KORINTHOS 1.200 -1.500KW




ILIA 2MW


ASTAKOS MESOLLOGGI 1500kW

ZAKYNTHOS 10.100KW

BOLOS 2200KW








1MW FLORINA


1300 KW OLYMPIA

8.100kW TRACKER ILIA - ZAKYNTHOS

